Proposal Writing Services · SubmittalForm 330 · RFQ · RFP
AEC Proposal Writers On Call

Proposal writerson call when yourteam is underwater.

rfpwriters.com is the on-call writing bench of BD-AEC, Scott Mann’s proposal practice for architecture, engineering, and construction firms. When too many RFPs land at once, a principal is drafting at midnight, or a proposal is in trouble days before it’s due, you plug in professional writers, managers, and reviewers who already work AEC selections. Take the whole proposal off your plate or hand off the one piece your team can’t reach. You keep running projects, we run the pursuit.

A BD-AEC service · Proposal development inside a business development practice

§ 01Problems We Solve

Where AEC pursuits go wrong

You don’t have a talent problem, you have a capacity problem. When three strong RFPs land in the same two weeks, the proposal gets written by whoever is least busy, which is rarely who should be writing it. These are the pressures a writing bench is built to absorb.

01

Too many RFPs at once

Three good solicitations post the same week and your team can seriously answer one of them.

02

Principals writing at midnight

Your most billable people burn nights on narrative instead of the projects that actually pay for it.

03

A draft in trouble

It’s days to the deadline, the draft is a mess, and nobody in-house has the hours to rescue it.

04

No in-house proposal role

Nobody owns pursuits, so every proposal is a fire drill run off the side of someone’s desk.

05

Inconsistent quality

A different overloaded person writes each submission, so no two read alike and none read like your best.

06

The deadline is slipping

The clock is running, the sections aren’t moving, and the submission is about to go out weak or late.

07

Your proposal lead is out

The one person who writes your proposals left or is on leave, and the pipeline didn’t pause to wait.

§ 02The Cost of Winning Work

A proposal is never free

A professional AEC proposal commonly consumes 50 to 100 hours across leadership, technical, marketing, design, and administrative resources. That time bills to overhead instead of a client, and it comes out of exactly the people you most need on projects.

Per pursuit, produced in house

50 to 100
internal hours per pursuit
$5,700 to $17,000+
illustrative internal cost

A proposal is never free when it is produced internally.

ResourceHoursIllustrative cost
Principal / seller-doer8 to 15$1,800 to $5,250
Project manager / technical lead10 to 20$1,250 to $3,500
Marketing / proposal coordinator20 to 35$1,500 to $3,850
Graphic design and production6 to 15$480 to $1,875
Executive review and admin support6 to 13$700 to $2,560
Total50 to 98$5,730 to $17,035

Illustrative fully burdened cost, including compensation, benefits, payroll expense, overhead, software, and indirect resources. Actual hours vary by pursuit.

The BD-AEC method

Once the strategy is set, most proposals are won or lost in the writing. A professional bench turns a rough draft into the submission an evaluator remembers, and it does it on your deadline instead of in spite of it.

§ 03The Standard

What a winning submission actually needs

A compliance matrix maps every requirement to a response. This is the one that decides most selections: the gap between how a firm usually submits and how a pursuit should be run.

A writer free this week

Most firms: Whoever is least busy
BD-AEC handles it

Surge capacity on demand

Most firms: One pursuit at a time
BD-AEC handles it

A recovery team for a draft in trouble

Most firms: A last-night rewrite
BD-AEC handles it

Real AEC selection experience

Most firms: A general freelancer
BD-AEC handles it

One consistent voice across authors

Most firms: A different hand each time
BD-AEC handles it

Compliance held to the letter

Most firms: Read it and hope
BD-AEC handles it

Delivered on your deadline

Most firms: A scramble to the wire
BD-AEC handles it
§ 04Services

The full scope, one shop

Plug in exactly what the pursuit needs. Hand off the whole proposal or the single piece your team can’t reach, from a full outsourced write to a last-minute recovery. Every writer here works AEC selections and nothing else.

01

Proposal Outsourcing

Hand us the whole proposal. We plan, write, and produce it end to end while your team stays on billable work.

02

Proposal Consultants

An experienced proposal consultant embedded in your pursuit to guide strategy, structure, and every section to submission.

03

Proposal Managers

A proposal manager for hire who owns the schedule, the compliance matrix, and every deadline, so your pursuit finally has a driver.

04

Proposal Reviews

An independent read against the evaluation criteria, with a marked-up copy and a punch list of what to fix before it ships.

05

Proposal Editing

Line editing that makes an uneven draft read in one confident voice, sharpens the argument, and holds every page limit.

06

Proposal Recovery

A draft in trouble with the clock running. We step in, triage what’s broken, and get it submission-ready by the deadline.

07

Proposal Planning

Compliance matrix, annotated outline, and a production schedule worked backward from the due date before the writing starts.

08

Not on the list?

If it touches a pursuit, it's in scope. Tell us what the solicitation needs.

Talk to Scott
§ 05Two Production Options

One strategic standard. Two levels of finish.

Every engagement is built around responsiveness, persuasive content, and a submission-ready final document. What changes between the two is how far the production goes.

Professional

Word-based production

Best fit
Straightforward SOQs, on-call selections, qualifications packages, and time-sensitive pursuits.
Production
A polished Microsoft Word layout, delivered as a submission-ready PDF.
  • Compliance matrix and pursuit strategy
  • Writing, editing, and QA/QC
  • Resumes and project descriptions
  • Photographs, tables, and basic graphics

Timing

Available at every schedule tier, subject to capacity.

Reviews

Two review cycles

Shortlist-critical

Signature

Creative production

Best fit
High-value, highly competitive, brand-defining, or shortlist-critical pursuits.
Production
Custom Adobe InDesign production by our creative team.
  • Everything in Professional
  • Custom visual concept and information design
  • Infographics, diagrams, and image treatment
  • Agency-level production quality

Timing

Best with 30 or more days. Generally available at 15 or more days.

Reviews

Content and design reviews

The production level changes. The strategic discipline does not.

Engage early

The best time to prepare for a proposal is before the opportunity is released.

Options and cost both reflect the time available to do the work responsibly. Engaging early preserves every production format, a full review cycle, and the most flexible footing. It is also why a reusable foundation, a case study library, current resumes, and a project image library built before the RFP posts, pays for itself across every pursuit that follows.

What a foundation builds

  • Case study library
  • Resume development
  • Personnel and project image library
  • Reusable marketing materials
Fractional BD at bd-aec.com
§ 06Our Process

How a pursuit runs

You bring us in and we plug into your pursuit, not the other way around. Here’s how an outside writing team gets up to speed and delivers on your deadline without slowing your people down.

  1. 1

    Scope Call

    We start with a call on the solicitation, the due date, and what your team can and can’t cover. You get the scope and the price in writing before we begin.

  2. 2

    Kickoff & Access

    We plug in fast. Past proposals, resumes, project data, and templates, so we work inside your files and your firm’s voice instead of around them.

  3. 3

    Proposal Planning

    We build the compliance matrix and an annotated outline, so every requirement maps to a section and an owner before a word is drafted.

  4. 4

    Drafting

    Our writers draft the sections you hand off and interview your engineers, so the technical narrative reads like your firm wrote it.

  5. 5

    Graphics & Design

    Org charts, schedules, and project sheets, laid out so an evaluator sees your strengths without digging for them.

  6. 6

    Review & Red Team

    An independent pass against the evaluation criteria, plus the recovery work when a draft lands in rough shape close to the deadline.

  7. 7

    Production & Submission

    Final formatting, packaging, and on-time delivery, physical or electronic, to the letter of the submission instructions.

§ 07Industries

Owners we write for

We write for the full design and construction market, and we know how each of these owners scores a submission. The engineering disciplines below link through to BD-AEC’s market pages.

EngineeringArchitectureConstruction
Environmental
Government
Transportation
Water / Wastewater
Utilities
Education
§ 08Why BD-AEC

More than a proposal writer

A generalist freelancer can turn a phrase, but they can’t tell an SF330 from an RFQ or write like an engineer under a page limit. Every writer on this bench works AEC pursuits and nothing else, which is the difference between filling pages and making a shortlist.

Business Development

This bench sits inside a business development practice, so we write toward winning the work, not just finishing the document.

Proposal Strategy

We carry win themes and discriminators through every section a freelancer would fill with boilerplate.

Technical Writing

We interview your engineers and turn dense expertise into narrative a non-technical evaluator follows on the first read.

Industry Experience

AEC only. We already know how public owners and private clients shortlist design and construction firms, so there’s no ramp-up on your dime.

Capture Planning

When there’s runway before the RFP drops, we help position the pursuit so the writing starts from ahead instead of behind.

Relationship Development

We write like a partner who knows your firm, because a bench you bring back learns your work, your people, and your voice.

Typical evaluation weightingIllustrative
Technical approach30%
Qualifications & experience30%
Past performance25%
Price15%

Most of the score is qualitative. We build the proposal to win the parts that are not price.

§ 09FAQ

Straight answers

How much does proposal writing cost?

It depends on the scope and the deadline. A single review or edit is a small fixed fee, a full outsourced proposal with graphics is priced by effort, and a rush recovery carries a deadline premium. We put the scope and price in writing before you commit, so you never get a surprise invoice.

Can you write an entire proposal for us?

Yes, and it’s the most common reason firms call. We take the whole thing: planning, writing, graphics, review, and production, with a proposal manager running the schedule. You give us the technical substance and your team stays on projects.

Can we hire a proposal manager for a single pursuit?

Absolutely. You can bring in a proposal manager for one pursuit without adding headcount. They own the compliance matrix, the schedule, and the assignments, then hand it all back the day you submit.

Our proposal is in trouble and due soon. Can you help?

Yes, recovery is a core service. Send us the draft and the solicitation, we’ll triage what’s broken on a quick scope call, and we’ll get it compliant and submission-ready by the deadline. The sooner you reach out, the more we can save.

Can you review or edit a draft we already wrote?

Yes. We run independent reviews and line edits on drafts your team produced. You get a marked-up copy against the evaluation criteria, a punch list of fixes, and an edit that makes an uneven draft read in one voice inside the page limit.

Do you write proposals for engineering firms?

Yes. Civil, structural, transportation, geotechnical, MEP, environmental, and water firms are the core of our work. We interview your engineers and turn their expertise into a compliant, persuasive proposal. If the pursuit is a statement of qualifications, our sister sites aec-soq.com and soqwriters.com go deep on SOQs and SF330s.

How fast can you start?

Usually within a day. Scott Mann responds within one business day, we scope the work on a quick call, and once the scope is signed we can be drafting the same week. For a recovery with the clock running, reach out the moment you know you’re in trouble.

§ 10Resources

Tools we bring to every pursuit

The writing and production tools we bring to every engagement. Ask for any of them on a scope call and we’ll run it against your live pursuit.

Field note

Proposal Triage Checklist

The fast diagnostic we run on a draft in trouble to decide what gets fixed first with the clock running.

Field note

Compliance Matrix Template

Map every requirement to a section, an owner, and a page count before the first sentence is written.

Field note

Section Outline Kit

Annotated outlines that tell each writer what a section has to prove and exactly how much room it gets.

Field note

One-Voice Style Sheet

The style rules that make a proposal written by several hands read like a single confident author.

Field note

Production Schedule Template

A calendar planned backward from the due date, with pink, red, and gold review dates built in.

Field note

Writer Handoff Brief

The one-page brief that gets an outside writer up to speed on your pursuit in an afternoon, not a week.

Ask for any of these on a discovery call. Request one →

§ Contact

Have a pursuit on the clock?

Send us the solicitation and your deadline. Scott Mann responds within one business day with a straight read on the pursuit, a go/no-go take, and what a winning submission needs.

Discovery call

A straight read on the pursuit and whether we should chase it.

Proposal assessment

A compliance and win-strategy review of a draft you already have.

Opportunity review

A go/no-go on a specific solicitation, scored before you commit.

scott@northbendpartners.com(859) 344-5690
Responds within one business day

Request a proposal assessment

AEC firms only. We'll never share your details.

Loading form…

The full BD-AEC practice at bd-aec.com